
Mbour-Fatick-Kaolack highway officially opens Saturday ahead of Gamou
President Bassirou Diomaye Faye will officially open the Mbour-Fatick-Kaolack highway for traffic on Saturday, August 22, 2026, at 10:00 AM. This opening, announced in a joint statement by the Ministries of Infrastructure and Land and Air Transport, aims to facilitate travel for the public during the Mawlid celebration. Regional authorities in Thi猫s, Fatick, and Kaolack are tasked with coordinating with AGEROUTE Senegal and the Soci茅t茅 des Autoroutes du S茅n茅gal ADS to ensure smooth and safe traffic flow along the entire route. The Thiadiaye-Kaolack highway will be fully open just days before the Gamou in Tivaouane, scheduled for August 25, 2026.



